Mining
Open-pit mining across two blocks with a modern heavy-equipment fleet and planning built on a 3D geological model.
Learn more: Mining
PT HBR Indo Gemilang mines and markets thermal coal from Kutai Kartanegara, East Kalimantan. Our mine, haul road and jetty are under one management, so we can stand behind every cargo's quality and schedule.
From the mine pit to the Muara Berau transshipment anchorage: 6 km to the ROM, 38 km of haul road, then 72 km by barge along the Mahakam River.
Mine pit
North & South blocks
6 km· Mine road
ROM & crushing
1,200 t/h
38 km· Dedicated haul road
Mahakam jetty
20,000 t/day
72 km· Barge, Mahakam River
Muara Berau
Transshipment to mother vessel
Photo: Herusutimbul · CC BY-SA 4.0
We hold an 8,750-hectare production-stage licence in Tenggarong Seberang district. Since our first shipment in 2014, output has grown to 4.2 million tonnes a year, and 78 percent of our workforce comes from East Kalimantan.
Company profileData as of 31 December 2025
Every tonne of coal passes through our own teams, from stripping overburden to loading the barge.
Open-pit mining across two blocks with a modern heavy-equipment fleet and planning built on a 3D geological model.
Learn more: MiningA dedicated 38 km haul road and our own jetty on the Mahakam River. Our coal never travels on public roads.
Learn more: Hauling & LogisticsThree low-sulphur thermal coal products from GAR 4,200 to 5,200 kcal/kg, sold FOB barge or mother vessel.
Learn more: Coal Products
Photo: Ilham Mufti Laksono · CC BY-SA 4.0
Our haul road was built for coal haulage alone. Residents never share the road with mine trucks, and shipments are never held up by traffic.
At the end of that road, our jetty loads up to 20,000 tonnes a day onto 300 ft barges that travel 72 km to the Muara Berau transshipment anchorage.
Every cargo is sampled by an independent surveyor. These are the typical values for our three products.
Full specifications| Product | GAR (kcal/kg) | Total sulphur (%) | Ash (%) |
|---|---|---|---|
| HBR-42 | 4,200 | 0.25 | 5.0 |
| HBR-46 | 4,600 | 0.40 | 6.0 |
| HBR-52 | 5,200 | 0.70 | 7.0 |

Sustainability
Reclamation starts on day one. Topsoil is stored when land is cleared, then returned and planted with native seedlings as soon as mining in the area is complete.
Our sustainability approachPhoto: Sabar Minsyah · CC BY-SA 4.0
Temporary photo
Workers in full PPE in the pit area
10 million hours worked without a lost-time injury, with fatal-risk controls verified every shift.
Health & safety at HBR
1,240 ha of post-mining land reclaimed with 34 native species grown in our own nursery.
Environment & reclamation
A fleet management system, a 250 kWp solar array and an electric haul truck trial on our 38 km road.
Read the storyTemporary photo
HBR operations team at the Tenggarong Seberang site
Careers
We are looking for engineers, operators and professionals who want to build a career at a mine that is run seriously. Internships and scholarships are open to young people from the region.
Our marketing team can send current specifications, certificates of analysis and available cargo dates.