Skip to main content
HBR Indo Gemilang
A hydraulic excavator loading a mining haul truck

Operations

First-half 2026 production reaches 2.2 million tonnes

Photo: Sandrerro · CC BY-SA 3.0

Output rose 7% year on year, driven by fleet productivity at the North Block pit and drier weather.

PT HBR Indo Gemilang produced 2.2 million tonnes of coal in the first half of 2026, up 7 percent on the first half of 2025. Sales over the same period reached 2.1 million tonnes, with 28 percent allocated to the domestic market obligation (DMO).

What drove performance

  • Fleet productivity. A new fleet management system lifted haul truck utilisation from 71 to 78 percent.
  • Less rain. Hours lost to rainfall fell 18 percent compared with last year.
  • No queue at the jetty. Average barge waiting time at the Mahakam jetty stayed below 10 hours.

The stripping ratio for the half was 7.6 : 1, in line with the annual mine plan approved by the Ministry of Energy and Mineral Resources through the RKAB.

Second-half outlook

The company maintains its 2026 production target of 4.4 million tonnes. Part of second-half volume will come from the expansion of the South Block pit, which produces the GAR 5,200 product.

This article is sample content for website design purposes.