Hauling & logistics
We run our own road, jetty and barge schedule, so coal moves from pit to mother vessel without depending on public infrastructure.
HBR supply chain
From the mine pit to the Muara Berau transshipment anchorage: 6 km to the ROM, 38 km of haul road, then 72 km by barge along the Mahakam River.
Mine pit
North & South blocks
6 km· Mine road
ROM & crushing
1,200 t/h
38 km· Dedicated haul road
Mahakam jetty
20,000 t/day
72 km· Barge, Mahakam River
Muara Berau
Transshipment to mother vessel
Photo: Herusutimbul · CC BY-SA 4.0

Photo: Consigliere Ivan · CC BY 2.0
A dedicated 38 km haul road
This 30-metre, two-lane road links the ROM stockpile to the jetty. It has no level crossings with public roads: the two crossings are built as underpasses.
- Length
- 38 km
- Width
- 30 m, two lanes
- Haul fleet
- 64 × 40 t trucks
- Public road crossings
- 0 (2 underpasses)

Photo: Consigliere Ivan · CC BY 2.0
Mahakam River jetty
Our own special terminal with a 180,000 t stockpile, an 1,800 t/h conveyor and a barge loader for 300 ft barges. Berthing is scheduled from tide forecasts.
- Loading capacity
- 20,000 t/day
- Stockpile
- 180,000 t
- Conveyor
- 1,800 t/h
- Barge size
- 300 ft (± 7,500 t)

Photo: Herusutimbul · CC BY-SA 4.0
Barges & transshipment
Barges travel about 72 km down the Mahakam River to the Muara Berau transshipment anchorage, where floating cranes transfer the coal to Supramax or Panamax mother vessels.
- River distance
- ± 72 km
- Transit time
- 18–24 hours
- Mother vessels
- Supramax / Panamax
- Load rate
- 15,000–25,000 t/day
Logistics capacity
| Stage | Capacity | Notes |
|---|---|---|
| ROM & crushing | 1,200 t/h | Product size 0–50 mm |
| Haul road | ± 24,000 t/day | 24-hour operation, 2 shifts |
| Mahakam jetty | 20,000 t/day | One barge loader |
| Transshipment | 15,000–25,000 t/day | Third-party floating cranes |