Hauling & Logistics
Haul road, jetty and barges

Our Business
We mine by open-pit strip mining across two blocks, at an average stripping ratio of 7.8 : 1.
Photo: Sandrerro · CC BY-SA 3.0
Every mining block goes through the same sequence, including a reclamation stage planned from the start.
Vegetation is cleared and the topsoil is stripped and stored for reclamation.
Overburden is dug by excavator and moved to dump areas or backfill.
Coal seams 2–6 m thick are cleaned and dug with smaller excavators to avoid dilution.
Coal is hauled to the ROM stockpile, crushed to 0–50 mm and sampled.
Mined-out pits are backfilled, covered with topsoil and planted with cover crops and native trees.
The fleet is operated together with two mining contractors under HBR safety standards.
| Equipment | Class | Units | Role |
|---|---|---|---|
| Hydraulic excavator | 200 t | 6 | Overburden stripping |
| Hydraulic excavator | 100 t | 14 | Overburden & coal |
| Mining haul truck | 100 t | 38 | Overburden haulage |
| Articulated dump truck | 40 t | 24 | Coal haulage to ROM |
| Bulldozer | D9 / D10 | 12 | Dumps & land shaping |
| Motor grader | 16 ft | 6 | Mine road maintenance |
Dummy data for design purposes.

Photo: Carol M. Highsmith / Library of Congress · Public domain
Our geological model is built from more than 1,850 drill holes and updated every year. Reserves are reported by an Indonesian Competent Person (CPI) under the KCMI code.
Mine plans run from life-of-mine down to weekly schedules, tracked by a fleet management system that logs every load-and-haul cycle.

Haul road, jetty and barges

GAR, TM, ash, sulphur and more

Reclamation, water and biodiversity