Skip to main content
HBR Indo Gemilang
A seedling nursery for reforestation at the forest edge

Sustainability

Environment & reclamation

Reclamation is part of the mine plan, not an afterthought. Every block we open already has a plan for closing it again.

Photo: Ai_nurarifin · CC BY-SA 4.0

Reclamation progress

of post-mining land reclaimed
1,240ha
planted since 2014
610,000seedlings
native plants propagated
34species
first-year plant survival
91%

Reclamation stages

  1. 01

    Backfilling

    Mined-out pits are progressively backfilled with overburden as mining advances.

  2. 02

    Land shaping

    The surface is reshaped to stable slopes with drainage channels to prevent erosion.

  3. 03

    Topsoil spreading

    Topsoil stored since land clearing is returned at a depth of 30–50 cm.

  4. 04

    Cover & pioneer crops

    Leguminous cover crops and pioneer trees improve the soil and provide shade.

  5. 05

    Native trees

    Ironwood, meranti and other native species are planted under the pioneer canopy.

  6. 06

    Monitoring & handover

    Plants are maintained and monitored for at least three years before assessment and handover.

Layered ridges of Kalimantan tropical rainforest

Photo: Sabar Minsyah · CC BY-SA 4.0

Land opened & reclaimed

Disturbed and reclaimed land (cumulative, hectares)
YearLand opened (ha)Reclaimed (ha)Ratio
20211,91064034%
20222,12078037%
20232,38093039%
20242,5601,09043%
20252,7101,24046%

Other environmental management

  • Mine water

    14 settling ponds with daily pH and TSS monitoring before water is released to rivers.

  • Biodiversity

    A 120 ha forest corridor is kept as wildlife habitat and a source of native seed.

  • Energy & emissions

    A 250 kWp solar array on site, an electric truck trial and a fleet fuel-efficiency programme.